Dubai is one of the most attractive markets in the region for private healthcare, but opening a clinic here is a regulated, multi-stage process. Most private facilities in Dubai are licensed by the Dubai Health Authority (DHA), and the licence covers far more than paperwork: the design, construction, equipment and staffing of your clinic all have to meet DHA standards before you can see your first patient.
This guide walks through the journey in the order it usually happens, so you can plan your budget and timeline with fewer surprises.
1. Confirm the authority and the facility type
Start by confirming who regulates your location. Clinics in mainland Dubai are licensed by the DHA, while facilities inside the Dubai Healthcare City free zone are regulated by Dubai Healthcare City Authority – Regulation (DHCR). If you are still choosing an emirate, read our comparison of DHA, DOH, MOHAP and DHCR.
Next, define the facility type precisely: a general clinic, specialised clinic, polyclinic, day surgery centre or diagnostic centre each comes with its own requirements for space, staff and equipment. The facility type also decides which parts of the DHA Health Facility Guidelines apply to your design, so it is worth getting right on day one.
2. Check the location before you sign a lease
Many delays start with the premises. Before committing to a unit, check that:
- the building and zoning permit healthcare use;
- the unit is large enough for the rooms your facility type requires, including support rooms such as clean and dirty utility, waste holding and staff areas;
- there is step-free access and suitable lift provision for patients;
- ceiling heights, risers and roof space can accommodate the ventilation, medical gas and drainage your services need.
A short pre-lease feasibility review by a healthcare planner usually costs far less than redesigning a unit that was never suitable.
3. Register the business and apply for the facility licence on Sheryan
Alongside the commercial (trade) licence for your company, the healthcare licence itself is applied for on Sheryan, the DHA's online licensing portal. DHA describes facility licensing as a two-step process: a New Facility Licence application, followed later by Activate Facility Licence.
The new licence that DHA issues at the end of the first step does not yet allow you to operate. You cannot treat patients until the facility has been built, inspected and activated. DHA's licensing manual also notes that if the licensing requirements are not completed within one year, the process is cancelled and the facility must re-apply, which makes realistic programme planning important.
4. Design to the DHA Health Facility Guidelines
DHA publishes detailed Health Facility Guidelines (HFG). They define the minimum standards for planning, design and construction, including functional planning units, schedules of accommodation, room data sheets and engineering requirements. For many facility types, design drawings must be prepared and submitted by a DHA-prequalified Health Facility Design Consultant.
Good design at this stage is not only about compliance. It sets the patient experience, staff efficiency and running costs for years. See our guide to planning patient flow around the DHA guidelines for the principles we apply.
5. Fit-out, equipment and staff licensing
Once drawings are approved, construction and fit-out can begin. In parallel:
- Medical equipment is selected, ordered and coordinated with the fit-out, so that power, data, water and gas points are in the right places. Our equipment planning guide explains how to avoid costly late changes.
- Healthcare professionals apply for their own DHA professional licences. Facility licensing and professional licensing are separate processes, and the facility cannot be activated without its licensed staff.
- Policies and procedures, waste management, infection control and patient-record arrangements are prepared for inspection.
6. Final inspection and licence activation
When the facility is complete, you apply to activate the licence. DHA describes the final inspection as a scheduled, pre-operational on-site inspection that checks compliance with its regulatory standards before the facility starts operating. An optional pre-inspection assessment is also available. Common reasons for failed inspections include missing signage, incomplete emergency equipment, documentation gaps and differences between the approved drawings and what was built.
Tip: walk the site against your approved drawings and the inspection checklist a week before the inspection, not the day before.
How long does it take?
Timelines vary with the facility type, the condition of the premises and how complete each submission is. In our experience, the stage that most often slows projects down is design and fit-out, rather than the authority review itself. Starting with a compliant layout and a coordinated equipment list is the single best way to shorten the overall programme.
Key takeaways
- Confirm the regulator (DHA or DHCR) and the exact facility type first.
- Check that the premises are suitable before signing a lease.
- Apply on Sheryan: a new facility licence, then activation after the final inspection.
- Design to the DHA Health Facility Guidelines with a prequalified consultant where required.
- Coordinate equipment, fit-out and staff licensing in parallel to stay on schedule.
MDP Healthcare supports clinic owners from feasibility and design through DHA approvals, fit-out and handover. Talk to our team about your project.
This article is general guidance. Requirements, fees and procedures are set by the DHA and can change, so always confirm the current requirements on the official DHA website before you apply.