A well-designed healthcare facility feels calm to patients and effortless to staff. Behind that feeling is careful planning: where each room sits, how people and materials move, and how clean and dirty activities are kept apart. In Dubai, these decisions are shaped by the DHA Health Facility Guidelines (HFG). This article explains how the guidelines are organised and the planning principles we apply on every project.
How the DHA Health Facility Guidelines are organised
The HFG is published in several parts. The ones that matter most at the design stage are:
- Part A – Administrative Provisions: the approval process for health facilities and the prequalification of health facility design consultants.
- Part B – Health Facility Briefing and Design: planning guidance organised into Functional Planning Units (FPUs), such as an outpatient unit or a day surgery unit. Each FPU sets out a description, models of care, functional relationships and a generic schedule of accommodation.
- Part C – Access, Mobility and OH&S: space standards, human engineering and ergonomic considerations.
- Part E – Engineering Services: the building services that support clinical areas.
Individual room types are defined as standard components, each with a Room Data Sheet (RDS) describing its requirements and a Room Layout Sheet (RLS) showing a typical layout at 1:50 scale. The guidelines also distinguish mandatory requirements from items marked as optional.
Principle 1: Start with the model of care, not the floor plan
Before drawing a single wall, agree how care will actually be delivered. How many consultations per day? Will patients have tests on the same visit? Is there a procedure room? These answers set the number and type of rooms. The schedule of accommodation in each FPU is a starting point that the brief then adapts to your services and patient volumes.
Principle 2: Separate the flows
Most healthcare facilities have several distinct flows that should cross as little as possible:
- Patients and visitors: from entrance and reception to waiting, consultation and exit.
- Staff: a back-of-house route between clinical rooms, staff areas and support spaces.
- Clean supplies: from delivery and clean storage to the point of care.
- Waste and used items: from dirty utility rooms to waste holding and collection, ideally without passing through patient areas.
The functional relationship diagrams in each FPU show which areas should sit next to each other. Treat them as a checklist when you review layouts.
Principle 3: Zone from public to private
Arrange the plan so that it becomes progressively more private: public reception and waiting at the front, consultation and treatment in the middle, and procedure, staff and support areas at the back. Zoning protects patient privacy, keeps unaccompanied visitors out of clinical areas and makes the facility easier to supervise with fewer staff.
Principle 4: Design rooms around what happens in them
A room data sheet lists the fittings, finishes, services and equipment each room needs. Coordinating it early with the medical equipment plan means power, data, medical gases, water and drainage end up exactly where clinicians will use them. Clearances around beds, couches and chairs also need to work for staff, patients and wheelchair users.
Principle 5: Plan for infection control and cleaning
Hand-wash basins at the point of care, suitable wall and floor finishes, clear separation of clean and dirty utility rooms, and ventilation that suits each room's function are all part of designing a facility that is easy to keep safe and clean.
Principle 6: Leave room to grow
Services change. Where possible, keep standard room sizes consistent so rooms can be repurposed, allow spare capacity in risers and electrical boards, and identify where a future expansion could connect.
Key takeaways
- Use the HFG structure: Part A for approvals, Part B for planning, Part C for space and ergonomics, Part E for engineering.
- Agree the model of care first; the schedule of accommodation follows from it.
- Separate patient, staff, clean and dirty flows, and zone from public to private.
- Coordinate room data sheets with the equipment list early.
Our healthcare planners and designers turn your clinical brief into a compliant, efficient layout. Explore our services or start a conversation.